Land Lease Options

Interested in leasing your land for an Endurance Wind Turbine? If you are interested in having an Endurance wind turbine on your property but want an easy and convenient option that does not require any form of payment or financing, you may consider leasing your land for an E-3120 wind turbine. Many landowners have chosen the rental route because it provides them a healthy income with the ability to concentrate on their core business. We have authorized partners that can take care of everything from obtaining planning consent to getting a grid connection and ensuring that construction, installation and ongoing operation are all in the hands of qualified specialists. The E-3120 is specifically geared for distributed wind energy production at your location. It is built to be safe and quiet with an aesthetically appeasing design that suits any landscape. They will stand on a tower from 24m to 36m in height to make a natural complement to an existing farm or piece of land. Please contact us for more information.

Fields with * required.

 
 
 
 
 
 
 
 
 
E-3120 50kW – for applications with large power consumption needs, requiring 100,000 – 250,000 kWh of annual energy production  225kW – for applications with large power consumption needs, requiring 400 – 1,000 MWh of annual energy production