Endurance Wind Power (UK) Limited – In Administration

Endurance Energy Mftg (UK) Ltd – In Administration

The affairs, business and property of Endurance Wind Power (UK) Limited and Endurance Energy MFTG (UK) Limited are being managed by Sarah O’Toole and Eddie Williams, appointed as Joint Administrators on 30 November 2016. The Joint Administrators act as agents of the Companies and without personal liability.

e4660 news & press

July 24, 2015 - Performance proves even greater in latest tests of Endurance E4660 wind turbine

Latest tests of Endurance E4660 wind turbine show 39% more energy production.

May 27, 2015 - First E4660 ships from Endurance Canadian head office and facility

First two E4660's ship out from Endurance head office!

December 10, 2014 - Endurance builds its 1,000th wind turbine

We built our 1000th wind turbine on December 10, 2014!

November 12, 2014 - Turning back the clock two years on Feed-in Tariff: Endurance Wind Power unveils an advanced new design

This new turbine generates 35% more electricity than the original model, which means a lower cost of energy and an excellent return on investment (ROI) even at modest wind sites, effectively turning back the clock on the UK Feed in Tariffs to 2012 levels.

The 35% jump in productivity more than compensates for the 30% Feed in Tariff (FiT) degression that has taken place over the last 18 months, giving installers a second chance at achieving the FiT revenues of 2012.